Office Relocation · Philippines

Office relocation in Manila and Cebu, for floors that never go dark

When the operation runs through the night, there is no quiet weekend to move in. Asia Relocation Philippines moves those floors in waves — a block of seats at a time, cut over and back in production before the next block is touched.

The country we started in, 2011 Manila and Cebu, our own facilities Seats moved in waves
2own facilities: Manila and Cebu
2011the country the company started in
1project lead, survey to restart
118client reviews across the company

Most advice about office moves assumes the lights go off on Friday. A large share of the floors we move here never go off at all: contact centres, shared service teams and back offices working someone else's business hours, where an empty seat is a queue somebody is waiting in.

That changes the method rather than the equipment. The floor is cut into blocks, each one packed, transported and reinstalled while the rest keeps answering. A block is only released once its replacement seats are live at the new address, which is why the inventory and the labelling matter more here than the number of trucks.

Asia Relocation Philippines works this way in Manila and in Cebu, with its own crews at both ends and one project lead across the whole thing — including the part nobody enjoys, which is negotiating the after-hours access with two buildings.

The perimeter

Ours to carry, and what stays with your own teams

An office move sits between property, IT and operations. Here is where our line runs.

Carried by the service

  • A survey at both addresses, and a plan built in blocks rather than in one night, when the operation has to stay live.
  • Building access: service lifts, loading bays and after-hours approvals, confirmed in writing before packing starts.
  • Packing, dismantling and labelling of workstations, furniture and archives, each crate marked to its destination seat.
  • IT handled apart: anti-static packing, reinforced crates where needed, its own inventory, supervised loading.
  • Reinstallation and sign-off against that inventory, block by block, with your floor plan as the reference.

The wave plan and its exclusions are written into the quotation.

A different service

  • Sourcing the new floor. Finding and negotiating premises is our office space service in the Relocation silo, not this one.
  • Bringing systems back up. We position, connect the obvious and tidy the cabling; commissioning and testing belong to your IT provider.
  • Homes for the people. Staff arriving with the office are handled by relocation services.
  • Company cars and bikes. A fleet changing address moves on its own file: vehicle transport.
  • Risk cover, and furniture with nowhere to go yet. Moving insurance is priced separately, and storage in the Philippines holds what the new floor cannot take on day one.

Any of these can join the same project. Raise it at the survey, not after.

Types of move

Five shapes of office move, and what each one asks of you

What decides the plan is whether the floor can stop, and for how long.

The live floor, moved in waves

Contact centres and shared service teams that cannot go quiet. Seats move in blocks across several nights, each block back in production before the next is unplugged. Longer on the calendar, shorter on the part that costs money.

Stays live

One weekend, whole office

The classic version, and still the right one when Monday is the only deadline. Friday night out, Sunday afternoon in, with IT reinstalled first so the technical checks happen while there is still time to fix them.

Weekend

Across the metro

Makati to BGC, Ortigas to Alabang. Two buildings with their own rules, and a run between them that only works at certain hours — the traffic is part of the plan, not an excuse offered afterwards.

Crosstown

Manila to Cebu, or the reverse

An office crossing water. The packing is built for a longer journey, the whole load travels on one inventory rather than van by van, and our teams at both ends mean the file does not change hands mid-route.

Between islands

Out of the country

Export packing, documentation, sea or air freight, delivery into the destination office. Same survey, same inventory discipline, with customs formalities added to the plan.

International
How it works

From the survey to a floor that is answering again

  1. Survey, and the question about downtime

    Volume, equipment and access at both ends — then the one that shapes everything: can the floor stop, and for how long? A wave plan and a weekend plan are two different projects.

  2. Access, opened first

    Service lifts, loading bays and permission to work at night, agreed in writing with both buildings. In Manila and Cebu this is usually the longest lead time in the file.

  3. Blocks, labels and inventory

    The floor is divided, each seat numbered to its destination, and IT listed apart. A crate that knows where it is going is what makes an overnight cutover possible at all.

  4. The cutover, block by block

    Dismantle, transport, reinstall, verify — then release the block and start the next. Nothing is declared done because it arrived; it is declared done because someone sat down at it.

  5. Sign-off and the snag list

    A walk-through against the inventory with your facility lead, and what remains is written down with a name and a date on it rather than promised on the way out.

Who it's for

Four kinds of floor, four different constraints

BPOs and shared service centres

Working someone else's clock, with service levels that do not pause for a move. Waves, night work, and a cutover measured in seats rather than in trucks.

Multinationals and regional offices

Approvals in another time zone and a budget signed off months ahead. What they buy is predictability: dates that hold and an invoice with no surprises in it.

Growing companies taking more space

Often moving twice in three years, and rarely with anyone internally who has done it before. The survey is where we hand back a plan they can present upwards.

Facility and procurement teams

Judged on cost and on nothing going wrong. They get a written scope, one contact, and an inventory that answers the question of where something ended up.

Manila, Cebu, the islands

Two bases, and the water in between

Collection and delivery across the archipelago, with the access checked before a date is agreed.

Metro Manila carries most of this work — Makati, BGC, Ortigas, Alabang — where the buildings are the constraint and the traffic decides the hours. Cebu is the second centre in its own right, not an outpost: offices open there, expand there, and sometimes move there from Luzon.

That last case is the one people underestimate. An office crossing to another island is closer to a shipment than to a house move, and it wants packing built for the journey rather than for a trip across town. Our teams at both ends are what keeps it one project instead of two.

FAQ

What operations managers ask before the survey

Can you move an operation that runs around the clock?
That is the normal case here rather than the exception. A floor that never goes dark moves in waves: a block of seats at a time, cut over and back in production before the next block is touched. It takes more nights than a single push, and it keeps the operation answering.
Do you work evenings, weekends and holidays?
Routinely, in Manila and in Cebu. Crews, vehicles and building access are booked for the hours you need rather than the hours that suit us. What has to be agreed early is the building's side: towers here are strict about after-hours work and the approvals are not instant.
How is IT equipment protected?
Servers, switches and workstations travel in dedicated packing with anti-static protection, and in reinforced crates where the equipment warrants it. Everything is on its own inventory line, loaded under supervision and unloaded the same way, so a missing item is noticed on the day and not a week later.
Can you move an office from Manila to Cebu?
Yes. Between the islands an office move becomes a shipping exercise as well as a logistics one, so the packing is built for a longer journey and the inventory carries the whole load rather than a van at a time. We have our own teams at both ends, which is what keeps one file across the water.
What about moving the office out of the country?
We handle export-grade packing, the documentation, freight by sea or air, and delivery into the destination office. It runs on the same survey and the same inventory as a domestic project, with customs added rather than a separate service being sold.
Who arranges access with the building?
We do, at both addresses. Service lifts, loading bays and permitted hours are confirmed in writing before packing starts. In Manila and Cebu this is often the longest lead time in the whole project, which is why we open it first rather than last.
Can you consolidate several offices into one floor?
Yes, and the hard part is not the transport. Three sites usually hold more furniture than one new floor can take, so the survey decides what moves, what goes into storage and what is disposed of before anything is packed. Deciding that on the day is what turns a move into a mess.
What drives the price of an office move here?
Volume first, then the access at both buildings, the hours the work has to run in, how much IT and archive handling is involved, and whether the move crosses water or a border. A survey turns those into a written figure with its exclusions stated.
Not what you were looking for?

Two pages next door

A household, not a company

An employee's home leaving the Philippines or arriving in it, customs file included.

Moving a home across a border →

The whole moving service

Every service we run in the Philippines, and which part your project needs.

Moving services in the Philippines →

Tell us whether the floor can ever be empty

That single answer decides the plan. We survey both addresses, open the building access, and come back with a wave schedule and a written figure.

Request an office move survey →